Rippling Intern Interview History: 17 Experiences (Part 5 of 5)
- Company
- Rippling
- Level
- Internship
- Stages
- OA → Phone screen → Onsite
Older Rippling SWE intern interview reports, 2019 to 2023: synonym and word-count tasks, tree problems, an LFU cache and HackerRank OAs.
At a glance
- Then: Entry H03 had IPv4 classes and beacon geometry on HackerRank, and entry H14 had Word Ladder on CodeSignal. Entry H05 had synonym sentences and entry H06 word counts in a phone screen.
- Tree problems: Entry H15 had three tree problems and a full LFU design.
Coverage: 17 intern reports from Feb 2019 to Oct 2023, kept for context. They are not counted in the overview tables.
Terms: OA = online assessment · HM = hiring manager · LLD / HLD = low-level (class) / high-level (system) design · VO = virtual onsite · DSA = data structures and algorithms · CodePair = HackerRank's shared coding pad.
In this series
- Part 1: overview, every question table, what to practise
- Part 2: OAs, recruiter and timing reports, no-task loops
- Part 3: screens
- Part 4: onsites
- Part 5 (current): History
History (before November 2023)
H01: An OA with an API task and a hard math question
Interview date: Oct 2023 · Role: Software Engineer (Internship) · Location: San Francisco · Result: No offer
- OA: One easy and two medium problems, an API parsing task and a hard math question.
- Call an API and work with what it returns (a HackerRank REST task).
H02: An OA across algorithms and REST
Report date: Oct 22, 2023 · Role: SWE Internship · Result: Rejected
- A HackerRank OA on topological sort, heaps, REST APIs and geometry.
H03: IPv4 classes, TV records and beacon geometry
Report date: Oct 18, 2023 · Role: Summer 2024 SWE Intern · Platform: HackerRank
- About 120 minutes, no camera: four basic MCQs and three coding tasks.
- IPv4 Address Classification:
-1for invalid, else class 1–5 by first octet (0–127,128–191,192–223,224–239,240–255). - TV Shows Produced During a Period: fetch paginated records, parse production spans (closed, ongoing or single year, sometimes after
(I)/(II)), return names in a year window in alphabetical order;endYear = -1means ongoing. - Cyber Beacon Detection: count integer points in an inclusive rectangle and within distance
Rof a beacon (rectangle(0,0)–(1,1), beacon(0,-7),R = 8gives3).
H04: DFS and union-find in the final round
Interview date: Oct 2023 · Report date: Dec 9, 2023 · Role: Software Engineer Intern · Location: San Francisco · Result: No offer
- OA.
- HR.
- Technical screen.
- Finals: Behavioral questions and coding.
- Medium problems involving DFS and union-find (not described).
H05: Synonymous sentences, then three stages of word counting
Interview date: Oct 31, 2023 · Report date: Nov 3 and 5, 2023 · Role: Summer 2024 Intern
- It began with a campus-event link in early September. The OA was on Sep 15 and the recruiter call on Oct 3. The phone screen on Oct 17 was Synonymous Sentences (LeetCode 1258) after 15 minutes of chat.
- Onsite (Oct 31): a technical talk on their projects and internships, and a three-part file task: count valid words, filter by a condition, then return the top K matching words (Count, Filter, and Rank Words).
H06: Review-document word counts grew into distributed design
Report date: Oct 5, 2023 · Role: Summer 2024 Intern · Stage: Technical screen
- For an analytics tool on performance-review documents: count a document's words, then the most common word, then the top three (Document Word Statistics).
- Then no more code: what if the counts do not fit in memory, or on one machine's disk? How would several machines compute it (Distributed Word-Frequency Analytics)?
H07: A hard coding round and a why-you question
Interview date: Mar 2023 · Role: SDE Intern · Location: Bengaluru · Result: No offer
- Coding: a hard problem, and the candidate found the interviewer rude.
- They were also asked why the team should pick them over others.
H08: Rejected after the HR screen
Report date: Dec 2022 · Role: SWE Internship · Result: Rejected after HR
- An OA with three coding questions and three MCQs, then a 30-minute HR call on background, résumé and the company. The technical and two-hour final were never reached.
H09: A graph-traversal screen
Report date: Dec 2022 · Role: Summer 2023 SWE Intern
- Graph traversal in the first technical; they did not reach the final round.
H10: An eight-week U.S. loop
Interview date: Nov 2022 · Report date: Oct 1, 2023 · Role: Software Engineering Intern · Location: San Francisco · Result: Accepted offer
- OA, recruiter, a one-hour phone technical, then onsite technical and behavioral interviews over eight weeks. Medium-to-hard coding, not named.
H11: Graphs after a mixed OA
Report date: Oct 18, 2022 · Role: Software Engineering Intern
- A HackerRank OA with MCQs and coding, a recruiter stage, a graph-focused technical and a final round.
H12: Jump scores and weighted endpoint picks
Report date: Aug 29, 2022 · Role: Full-time plus six-month internship · Result: Selected
- OA: three questions on trees/DP and binary search; about two and a half solved.
- Technical 1 (45 min): projects, then maximum jump score: from index 0 to
n−1, jumping 1 to K forward, summing visited values; recursion, DP, heap and deque approaches. - Technical 2 (60 min): projects, then the largest sum of K picks from either end, followed by fixed-order multipliers on the picks, solved with DP. No HR round.
H13: Résumé, practical coding and scaling a project
Interview date: Aug 2022 · Role: SWE Intern · Location: Canada · Result: Declined offer
- Interview: Their résumé, practical coding and how their projects would scale.
H14: Three named problems in a 75-minute CodeSignal OA
Report date: Mar 20, 2022 · Role: SDE Intern · Platform: CodeSignal
- Palindrome Permutation (LeetCode 266), Word Ladder (LeetCode 127) and Reverse Substrings Between Each Pair of Parentheses (LeetCode 1190). No result shared.
H15: Three tree problems and a full LFU design
Report date: Nov 29, 2021 · Role: Intern + FTE · Result: Selected
- OA (60 min): an endpoint game (take first or last value, maximize first-minus-second score), a prime digit-sum count over
[L,R]up to10^18, and a graph problem. Two fully solved; ten advanced. - Technical (60 min): on an N-ary tree, the maximum-average subtree root, maximum invitations with no adjacent invitees, and minimum broadcast rounds (each informed node tells one child per round).
- Design (60 min): project challenges, then a full LFU cache with LRU tie-breaking. Four reached this stage; two, including the author, were selected.
H16: Four coding topics across two rounds
Report date: Feb 13, 2021 · Role: SWE Internship · Result: Accepted offer
- Two coding rounds: two string questions, one DP and one graph. The hiring-manager round was skipped.
H17: A referral and three DSA interviews in 2019
Interview date: Feb–Apr 2019 · Role: Summer Intern · Location: India · Result: Offer
- A referral and three DSA interviews between the end of February and the end of March, rising from easy to medium-hard. The offer came in April.
Keep practicing
- Walk me through a past project in depth: see reports H05, H13 and H15.
- Top K Frequent Words: see reports H05 and H06.
- IPv4 Address Classification: report H03.
- Rippling question banks, sign-in needed: coding, behavioral, system design and project coding.
- The Rippling interview guide, Rippling hiring insights and the Experience feed.
- More roundups: new grad, experienced SWE, no level and AI coding rounds.
In this series
Sources: Anywhere useful interview info can be found.
Comments
0No comments yet — be the first to share what you know.