FastPrepFind an Entry of Pascal’s Triangle
Problems/Find an Entry of Pascal’s Triangle

Find an Entry of Pascal’s Triangle

Morgan Stanley logoMorgan Stanley● EasyFULLTIMEOA

Updated Nov 2026

QuestionFunctionExamplesConstraints

Problem statement

Source note: Reported in a Morgan Stanley online assessment for a full-time role. The author asks to find a required element but does not give row and column indexing or limits. Here the row and column start at zero. Entries are exact integers for rows 0..30. We chose these details and the function interface.

Our version is about 90% the same as the reported question.

Return the entry at zero-based row and column in Pascal’s triangle. Row 0 is [1]. Every later row begins and ends with 1, and each interior entry is the sum of the two entries immediately above it.

For this exercise, column 0 is the leftmost entry and row r has r+1 entries. Inputs always satisfy 0<=column<=row. Return the exact integer value, without a modulus.

Function

pascalEntry(row: int, column: int) → int

Examples

Example 1

row = 5column = 2return = 10

Zero-based row 5 is [1,5,10,10,5,1]. Its column 2 entry is 10.

Example 2

row = 0column = 0return = 1

The triangle’s top row is row 0, [1], whose only entry at column 0 is 1.

Constraints

  • For this exercise, assume 0 <= row <= 30.
  • For this exercise, assume 0 <= column <= 30.
  • column is less than or equal to row.

More Morgan Stanley Online Assessment questions

  • Three-Resource 0/1 KnapsackOA · Seen Sep 2026
  • Maximum Concurrent ProcessesOA · ONSITE INTERVIEW · Seen Sep 2026
  • Maximum Total of Nonadjacent RatingsOA · Seen Jul 2026
  • Count Shipment SchedulesOA · Seen Apr 2026
  • Delete and EarnOA · Seen Apr 2026
  • Interleave Array HalvesOA · Seen Apr 2026
  • Get Patch SequenceOA · Seen Feb 2025
  • String Subsequences 🐳OA · Seen Mar 2024
  • Binary Tree Level OrderOA · Seen Feb 2024
  • Merge IntervalsOA · Seen Feb 2024

Similar questions at other companies

  • Enough Muffins for the LineSusquehanna International Group (SIG) · OASusquehanna International Group (SIG) interview questions
  • Count Numbers with Digit SumCisco · OACisco interview questions
  • Climb Stairs with One or Two StepsIntuit · OAIntuit interview questions
  • Count Lucky TicketsThe D.E. Shaw Group · OAThe D.E. Shaw Group interview questions
  • Maximum Signal Walk in a Server TreeTower Research Capital · OA
  • Maximum Score with Prime JumpsMicrosoft · OAMicrosoft interview questions
  • Jump Game with Prime-3 StepsUber · OAUber interview questions
  • Profitable Currency Exchange CycleOptiver · OAOptiver interview questions
  • Count Valid A-B-C Sequences Under a Modulo-Four RuleInfosys · OAInfosys interview questions
  • Unique Paths Through a GridPeopleStrong · OAPeopleStrong interview questions

Interview reports that mention this question

  • Morgan Stanley New Grad Technology Analyst: 2 Experiences

Morgan Stanley interview experiences

  • Morgan Stanley Apprenticeship and Tech Interviews: 6 Experiences
  • Morgan Stanley Intern Oldest Loops: 5 Experiences (Part 5 of 5)
  • Morgan Stanley Intern OOP Loops: 5 Experiences (Part 4 of 5)
  • Morgan Stanley Intern Earlier Loops: 5 Experiences (Part 3 of 5)
  • Morgan Stanley Intern Tech Rounds: 5 Experiences (Part 2 of 5)
All Morgan Stanley interview questionsSee Morgan Stanley hiring insights
Saved
class Solution {
    public int pascalEntry(int row, int column) {
        // Write your code here.
    }

}
Checking account…